Arlington





Type of Project:

Structural rehabilitation of truss bridge and application of improved steel coating system.

Project Description:

Repairs of all joints and connections on lower section of bridge, clean and apply protective coating system.

Reason project was undertaken:

To restore structural load capacity, stop crevice corrosion and pack rust, and apply long lasting protective coating to the steel.

Name and location of facility:

Arlington Bridge, located over CP Rail yard in Winnipeg, Manitoba, Canada

Project start and completion dates:

May - October 92

Service Environment:

Industrial / Urban, heavy road salt

Surface Preparation: Methods, degree of cleaning, profile:

SSPC SP 6 at 2 mil profile

Coating application methods, equipment:

Airless spray, brush

Coating system, number of coats, dry film thickness per coat, etc.:

Application of Termarust 2200 Penetrant to joints and connections followed immediate with an application of Termarust 2100 Primer/Topcoat, 10 mils DFT.

Safety and Environmental Protection Measures:

Containment platforms and tarps to protect the rail yard underneath. No lead program.

Unusual Job conditions:

Working over an active rail yard. Clearances for platforms were a problem.

Evidence of good performance:

Five year warranty on the coating (that included joints and connections) has expired with no claims against Termarust.

Why Termarust was used:

Termarust and the contractor provided a 5-year warranty on leakage from pack rusted joints and connections and a minimum 25-year coating system service life.

Owner’s Representative:
Contact: Bill Epenspanger, City Engineer
Company: City of Winnipeg
Tel: 204-986-5283

Contractor:
Contact: Ron Lambert
Company: Winnipeg Sandblasting
Tel: 204-633-2750





 