BC Hydro





Type of Project:

Overcoating four Penstocks

Project Description:

Four Penstock pipes that feed water to turbines in the powerhouse. Length: 540-feet Diameter: 22-feet Total: 136,080 sq. feet

Reason project was undertaken:

To preserve the structure and existing coating for 25-years.

Name and location of facility:

Dam Penstocks at Kootney Canal near Castegar, B. C.
B. C. Hydro, Kootney River, South Slowcan Generating Station

Project start and completion dates:

Three year project, completed in fall 2000

Service Environment:

Rural / Industrial

Surface Preparation: Methods, degree of cleaning, profile:

5,000 PSI High Pressure water wash to a SSPC SP12 WJ4

Coating application methods, equipment:

Airless spray and brush

Coating system, number of coats, dry film thickness per coat, etc.:

Spot prime 5 mils DFT of Termarust 2100 (RAVCS®) Primer/Topcoat on bare metal and rusted surfaces.
An overcoat of 5 8 mils DFT Termarust 2100 (RAVCS®) Primer/Topcoat, color matched.

Safety and Environmental Protection Measures:

Environment around the project had to be protected from contamination.

Unusual Job conditions:

Fall Prevention System. Contain all water and filter, four-week duration.

Evidence of good performance:

Overcoating job secured by a five-year warranty that includes pack rusted joints and connections.

Owner’s Representative:
Contact: Bill Epenspanger, City Engineer
Company: B. C. Hydro
Tel: 604-528-8336
Fax: 604-528-8133

Contractor:
Contact: Cliff Harper
Company: Kootney Powder Coating
Tel: 250-365-5400
Fax: 250-365-3390





 