Redwood Bridge





Type of Project:

Structural rehabilitation of two-lane thru truss bridge and application of improved steel coating system.

Project Description:

The deck truss system was sand blasted and painted over a 3-year period with special emphasis on structure critical pack rusted joints and connections.

Reason project was undertaken:

To restore structural load capacity, stop crevice corrosion and pack rust, and apply long lasting protective coating to the steel.

Name and location of facility:

Redwood Bridge located over the Red River on Redwood Blvd., between Henderson Highway and Main Street, Winnipeg, Manitoba, Canada.

Project start and completion dates:

April 89 - October 91

Service Environment:

Urban / Marine

Surface Preparation: Methods, degree of cleaning, profile:

SSPC -SP 6, 2 mil profile

Coating application methods, equipment:

Airless spray

Coating system, number of coats, dry film thickness per coat, etc.:

Wet coat Termarust 2200 (RAVCS®) Penetrant Sealer in all joints and connections. Single coat, 10 mils DFT of Termarust 2100 (RAVCS®) Primer/Topcoat on all surfaces.

Safety and Environmental Protection Measures:

Free blasting before lead rules were in effect.

Unusual Job conditions:

Different levels of surface preparation were tested to establish a balance between cost and performance.

Evidence of good performance:

After 10 years, the coating is stable in pack rusted joints and connections.

Why Termarust was used:

Termarust and the contractor provided a 5-year warranty on leakage from pack rusted joints and connections and a minimum 25-year coating system service life.

Owner’s Representative:
Contact: Bill Epenspanger, Engineer
Company: City of Winnipeg
Tel: 204-986-5283

Contractor:
Contact: Maurice Bourbonais
Company: Carlson Decorating & Sandblasting
Tel: 204-233-0671




 